Tracking building service and maintenance schedules: spreadsheet or software?

Short answer

Yes, a spreadsheet works as a service schedule and contractor log, and for a building with a handful of systems and one person in charge it is enough. It stops working when the person who knows the schedule leaves, when due dates pass unseen, or when the contracts, certificates and history of each item are scattered over inboxes and folders.

The lift, the boiler, the fire alarm, the pumps: each has a service interval, a contractor and a paper somewhere. A sheet with one row per item and a next-due date is the usual start.

The task: know what has to be serviced and when, who does it, and what was done last time.

A service schedule you can copy

Use one row per piece of equipment and service task, with the date it was last done and the interval. The next due date is calculated, so it cannot drift away from the other two.

EquipmentLocationService taskContractorLast doneInterval (days)Next dueContract or certificate
Passenger liftEntrance 1Technical inspectionLift contractor2026-05-121802026-11-08Service contract on file
Gas boilerBoiler roomAnnual serviceHeating contractor2026-03-203652027-03-20Certificate 2026
Fire alarmAll entrancesPanel testSafety contractor2026-08-01902026-10-30Test report
Water pumpsBasementCheck and oilCaretaker2026-09-051202027-01-03None

Paste into cell A1 of a new sheet (tab-separated):

Equipment	Location	Service task	Contractor	Last done	Interval (days)	Next due	Contract or certificate
Passenger lift	Entrance 1	Technical inspection	Lift contractor	2026-05-12	180	=E2+F2	Service contract on file
Gas boiler	Boiler room	Annual service	Heating contractor	2026-03-20	365	=E3+F3	Certificate 2026
Fire alarm	All entrances	Panel test	Safety contractor	2026-08-01	90	=E4+F4	Test report
Water pumps	Basement	Check and oil	Caretaker	2026-09-05	120	=E5+F5	None

Next due = Last done + Interval (=E2+F2), formatted as a date. Sort by Next due and colour the rows that fall within the next 30 days. Keep each contract and certificate in one folder named after the equipment, and put the file name in the last column.

Signs you have outgrown the sheet

A schedule is only as good as the person who looks at it.

  1. 1

    One person holds the schedule

    If the dates live in one head or one file, a holiday or a resignation leaves the building without a schedule.

  2. 2

    Due dates pass unseen

    A sheet does not tell you that a service is due. Someone has to open it, sort it and look.

  3. 3

    The history is scattered

    Contracts, certificates, photos and acts sit in different inboxes and folders, and a new contractor starts from zero.

  4. 4

    You do not know who is responsible

    A name in a column is not an assignment. When a task is missed, nobody was asked.

  5. 5

    Faults and service are separate lists

    A breakdown reported by a resident and the planned service of the same boiler live in two places, so the history of the equipment is never in one view.

  6. 6

    A warranty runs out unnoticed

    A warranty end date typed into a notes column is found after the warranty has ended.

The same task in Unitify

Start on the Free plan ($0 / apartment / month). A plan, not a trial. No card, no expiry. The pricing page lists which plan includes the equipment register.

  1. 1

    One card per piece of equipment

    Name, engineering system, manufacturer, model, serial number, install date, warranty end and status, placed in a building, section, floor or unit. Each card names a primary and an additional responsible employee, and equipment can be nested, such as a bearing under a pump.

  2. 2

    Contracts, manuals and photos on the card

    Upload files to the card and mark each as a photo, manual, contract, certificate or other.

  3. 3

    A maintenance plan per item

    Add a plan with the task and the interval in days, and create a ticket for the equipment from it with one button. The screen does not yet take the date a service was last done, so it does not calculate the next due date; keep that date in your sheet. You can import an equipment list from an Excel or CSV file.

  4. 4

    Faults on the same card

    A request can be linked to a piece of equipment, and the card lists its related tickets, so planned service and breakdowns sit in one history.

The pricing page lists which plan includes the equipment register: Free is $0 / apartment / month, Base is $1 and Pro is $3. Prices follow the live pricing page, which shows euro excluding VAT in Europe.

What Unitify does not do here

  • Unitify does not remind you when a service is due and does not yet calculate the next due date on screen. Creating the ticket on time is your step.
  • There is no register of contractors. The responsible person on a card is an employee of your organization, so name the contractor in the plan’s task text or file the contract on the card.
  • It does not replace the inspections your law requires or an official building record. The interval is the one you enter, from your law and your contracts.
  • It is built for owner-occupied buildings run by an association or a management company.

Service schedule: questions

Can I keep a building maintenance schedule in Excel or Google Sheets?

Yes. One row per piece of equipment and service task, with the date it was last done, the interval and a calculated next due date, is enough for a building with a few systems and one person in charge.

What should a service schedule contain?

The equipment, where it is, the service task, who does it, the date it was last done, the interval in days, the next due date and the contract or certificate that goes with it.

Does Unitify remind me when a service is due?

No. The plan stores the task and the interval, and you create the ticket from it. Keep the due dates in your sheet for now.

Can I attach contracts and certificates to the equipment?

Yes. Files go on the equipment card and are marked as a photo, manual, contract, certificate or other.

Can I import my equipment list?

Yes, from an Excel or CSV file. Equipment can be placed in a building, a section, a floor or a unit.