Skip to content
Unitify
Guides

White, Green and Black Frame in Georgia: What It Means

By Ilia SotoninHandover, New build
White, Green and Black Frame in Georgia: What It Means

A new-build apartment in Georgia is often described in three words: black, white or green frame. These names come from market practice, and each developer uses them a little differently. This page does not rely on a statute: it says what they usually mean, what to check at handover in each state, and where to write down a defect you find.

In short: what the three names mean

The stages follow one another: black, white, green. Each next one is closer to the final finish. Below is the typical content. Some developers use these names differently, so read what your contract says.

Black frame. The starting stage: only the core construction, meaning load-bearing walls, partitions and floor slabs. Utilities are usually not brought into the apartment and there is no finishing. Windows and the entrance door differ from project to project.

White frame. The intermediate stage: the main utilities are brought in (electrics, water, sewage and heating are the ones usually named), the walls are levelled and plastered, the floor has a rough screed, and the windows and the entrance door are fitted. Finishing and the work that precedes it is left to the buyer.

Green frame. The pre-finishing stage: the apartment is fully prepared for the final layer. Walls and ceiling are usually puttied and primed, the floor is levelled and utilities are distributed throughout. What is left for the buyer is painting or wallpaper, flooring, interior doors, plumbing fixtures and lighting.

What the contract decides

The word "white" or "green" proves nothing by itself, because some developers use these names differently. If the price or a handover condition rests on the name, write the list of works into the contract or its annex: what is done, with what materials and what is left to the buyer. At handover, compare the apartment with that list, not with the name.

Show any disputed wording to a lawyer.

What to check at handover

Tick only what is in the contract's list. What is not there, do not demand and strike out.

Black frame

  • The apartment area and the room sizes match the contract plan. Measure.
  • Load-bearing walls and partitions have no cracks or damp marks, and the slab is intact.
  • Window and door openings are in the right place and the right size per the plan; if windows and door are in the contract, they are fitted.
  • Cable and pipe entries are at the apartment boundary, where the plan shows them.
  • The balcony railing is solid and the floor slopes towards the drain.
  • Shared systems that the contract says reach the apartment are brought to its boundary.

White frame

  • The plaster is sound: no hollow sound when tapped, no cracks.
  • Hold a long straight edge against walls and floor: no gaps should show.
  • The rough floor screed is firm and does not crumble or crack.
  • Electrics, water, sewage and heating, where the contract covers them, are brought in per the plan; the board is labelled and the breakers switch on.
  • Pipes do not leak, which you check at the meter; drains are not blocked.
  • Windows: the glass is intact, sashes open and close, and there is no draught.
  • The entrance door closes, the lock works and every key fits.

Green frame

  • Check everything listed for white frame here too: plaster, floor, windows, entrance door.
  • Walls and ceiling are puttied and primed, the surface is even and the corners are straight.
  • The ceiling is ready for painting or the final finish.
  • The floor is levelled and ready for flooring.
  • Utilities are distributed throughout: sockets and switches work, water reaches every point, with no leaks and no blocked drains.
  • Heating and ventilation, if the contract covers them: radiators or pipework are in place and the vent duct is clear.
  • The points (sockets, water outlets) match your future layout.

Where to write a defect

Write every defect you find into the handover act: room, description, photo, who fixes it and by when. A written note and a photo record the defect on paper; without them it is hard to settle later whether it was there at handover.

A sample apartment handover act in Georgian and English can be downloaded as Word and PDF. The apartment's state is chosen per the contract: black, white or green frame, handover with renovation, or other.

For developers

If you sell apartments, this page and the sample act are a handy link for the sales department: the buyer sees in advance what each state gives and what to check. Unitify already has an inspection checklist, a photo for every defect and warranty requests created from defects; a Georgian and bilingual act is set up for your project. More: smart building and apartment handover for developers in Georgia.

Book a demo to see what handover looks like on your complex.

Topics:HandoverNew build

Frequently asked questions

What does white frame mean in Georgia?

In market practice it is the intermediate stage: the main utilities are already brought into the apartment (electrics, water, sewage, heating), the walls are levelled and plastered, the floor has a rough screed, and the windows and the entrance door are fitted. Finishing is the buyer's job. Some developers use the terms differently, so the exact list is in the contract.

What is the difference between green and white frame?

Green frame is one step ahead of white: the apartment is fully prepared for the final finish, the walls and ceiling are usually puttied and primed, and utilities are distributed throughout. What is left for the buyer is painting or wallpaper, flooring, interior doors, plumbing fixtures and lighting. Some developers draw the line elsewhere, so compare the contract's list of works, not the names.

What does black frame mean?

The starting stage: only the core construction, meaning load-bearing walls and partitions. Utilities are usually not brought into the apartment and there is no finishing; windows and the entrance door depend on the project. What a particular black frame includes is set by the contract.

Who decides what white or green frame includes?

The contract and its annex. These names come from market practice, some developers use them differently, and this page does not rely on a statute. If the price or a handover condition rests on the name, ask for the list of works in writing: what is done, with what materials and what is left to the buyer.

What should I check when accepting an apartment?

Start from the contract's list and walk through the rooms and systems: walls, floor, windows, entrance door, water, electrics, meters. Write every defect into the handover act with a photo, a deadline and a person responsible.